PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing the underground Tele-Data piping at Rahway Ave. in front of the New Court Building (800x600).jpg Compacting along column line 1 from B-D Facing South (800x600).jpg Excavation at Rahway Ave. View from the 3rd Floor (800x600).jpg Installed electrical conduit at the Sprinklers Room (152A) Facing South (800x600).jpg Installing bearing plate boxes at Stair -2 (4th Floor) Facing South (800x600).jpg Lifted the slip forms to the 4th Floor at Elev. 1,2,3 Facing East (800x600).jpg
Previous pageNext page Installing bearing plate boxes at Stair -2 (4th Floor) Facing South (800x600)
Installing bearing plate boxes at Stair -2 (4th Floor) Facing South (800x600)